24/05/2026
🔥 HQ REFURB UPDATE | WEEKS 11–14 🔥
The graft continues… and Heart Grid Collective HQ is baring her soul.! ❤️🔥
From bare floors, tools everywhere, stripped walls and old boiler set back chaos… To branding on the walls, rooms looking sharp, fresh energy landing, shelving ready for stock, feature walls being built and the new boiler finally installed… 🫡
This isn’t just a refurb.
This is a four-storey mission being built by real hands, real heart and a ridiculous amount of determination. 💪🏽💥
It all means something.!
We are building a space for healing, wellbeing, education, spiritual development, community, connection and transformation… FOR YOU.!!! 🫵🏽
A place where people can walk in carrying the weight of the world and leave feeling like they’ve remembered who they are.
Weeks 11–14 have been heavy, messy, emotional, powerful and absolutely worth it.!! 👊🏽
The building is waking up.
The vision is becoming physical.
The HQ is coming online.
Heart Grid Collective is coming. 🧬💙
And trust us…
We’re only just getting started. 🚀🔥