10/14/2026
Three ball fields, two wings, one very busy year in Taholah. 🐝
The New Taholah K-12 School has come a long way since our crews mobilized in January. Framing is nearly done, and the primary and secondary wings and shared spaces now look like the school they’re going to be. Next up: roofing and exterior siding.
Out on the site, the football, baseball, and softball fields are graded and seeded, so the grass is officially on the clock. Large retention ponds are shaped and doing their job, tied together by large-diameter storm drain pipe. Asphalt paving is off to an early start, too.
This campus is part of the effort to relocate the village of Taholah out of the tsunami inundation zone, and every milestone here moves that work forward.
Photos courtesy of our project partner, Construction Services Group.
PROJECT PARTNERS
Owner: Taholah School District
Owner’s Rep: Educational Service District 112 / Construction Services Group
Architecture: Arcadis
Structural: Degenkolb Engineers
Civil: Akana
MEP: Tres West Engineers
Landscape: Osborn Consulting
Acoustics: A3 Acoustics, LLP
Food Service: JLR DESIGN GROUP INC
Theater: PLA Designs, INC